THE CHALLENGE

Complete Remediation was tasked with addressing the risk of asbestos in site soils.

This risk could lead to hazardous classification, increased disposal costs, and introduce programme and commercial risks.

A detailed site investigation was conducted to classify waste and find compliant disposal routes.

OUR SOLUTION

A detailed site investigation was performed to classify waste and identify disposal options.

The assessment confirmed that the soils were non-hazardous.

A suitable disposal facility was secured to handle the required volumes for follow-on works.

The disposal of all site materials was managed.

Surface validation sampling was completed.

A verification report was issued to confirm compliance.

THE OUTCOME

  • Soils were confirmed as non-hazardous, thereby avoiding hazardous disposal costs.
  • Commercial and programme risks were eliminated through clear technical evidence.
  • A suitable disposal route was secured to meet programme requirements.
  • Compliant disposal, validation, and verification were achieved to support project sign-off.

more case studies

Explore Our Other Projects

Carrington Waste Management Contract

Client: Carrington

Harrow - Site Clearance to Enable Ecological Surveys

Client: Harrow

Metal Decontamination and Waste Classification

Client: London Scrap Terminal

Ready to discuss your project?

Let's explore how our proven expertise can deliver successful outcomes for your next project.